Electrical

Electrical contractor software for permitted work

Electrical work has a shape most scheduling software ignores. The job stops in the middle, waits for somebody who does not work for you, and then starts again. Software that only models a one visit job cannot hold that.

What does electrical contractor software need to do?

It has to model a job that takes more than one visit with a wait in the middle, because permitted work stops at rough in until an inspector passes it. It has to capture proof at rough in, since the walls close after that and photographs are the only record. Then it has to bill once the final inspection clears rather than when the crew finished.

How does a permitted job run on it?

The same tools every Pinstripe Fleet customer gets, set up the way this trade runs.

One job, several visits

A permitted job is not one appointment. Rough in, inspection, then finish and final. Each visit sits on the same job with the same history, so the second crew sees what the first one did rather than starting from a phone call.

  • Jobs
  • Schedule
  • Job timeline

The inspection is the hold

A rough in inspection happens after wiring, conduit, boxes, and raceways are installed but before walls, ceilings, or floors are closed. Until it passes, nothing else can proceed. Park the job, keep the site on the board, and reschedule the finish when the inspector clears it.

  • Dispatch board
  • Reassignment

Photograph it before the walls close

Rough in is the last moment anybody can see the work. Required photos and a checklist on the phone mean that record exists whether or not the inspector queries it, and it survives on the job rather than in somebody's camera roll.

  • Photo capture
  • Checklists
  • iPhone app

Bill on the final, not on the last visit

Invoice off the finished job with every visit's hours already attached, so a job spread over three weeks bills as one number rather than three guesses. The customer pays by card from a link into your own bank account.

  • Invoices
  • Time tracking
  • Card payments

What is set up for an electrical contractor?

Setup starts you with open dispatch slots rather than fixed routes, a service list built around installs, repairs, and service calls, a close out checklist with required photos, and invoicing off the completed job.

Common questions from electrical companies

Can one job hold several visits weeks apart?

Yes. Appointments attach to the job, so rough in, the return after inspection, and the final all sit on one record with one history and one set of hours. That is what lets the invoice come out as a single number at the end.

Does it track permits and inspection results?

Not as their own record type. What it does is hold the job open across visits, keep the photos and notes from rough in, and let you reschedule the finish once the inspector clears it. If a formal permit register decides your purchase, that is not built today.

What happens when an inspector reschedules?

Move the affected visit on the dispatch board and reassign the crew to something else that day. The customer sees the change on their portal link, which saves the call explaining why nobody turned up.

Can I stop an apprentice seeing job values?

Yes. You decide who can see money, and for anyone not allowed to, prices and totals are never sent to their device in the first place rather than being hidden on the screen.

Not sure it fits how you work?

Bring three jobs you ran last week and we will build them in front of you. If it cannot handle your real work, you will know in twenty minutes.

Pinstripe Fleet Management is built and supported by Pinstripe Business Services.